I
Ian Macky
What is the first-time power-on sequence to bootstrap a PC5010?
The installation guide just says don't apply A/C until the wiring
is finished, and is generally unhelpful.
I have the main cabinet with A/C and battery, plus the high-current
cabinet with A/C and battery. What gets power the very first time
when turning it on (to probe for modules, assign keypads, etc)?
Also, does it use flash memory for its programming? I assume it
doesn't need power (external or on-board battery) to keep its
programmed config, right?
As for batteries, when do you connect the big backup batteries and
charge them up?
--ian
P.S. Thanks to everyone for the help so far, this group has been
very useful. If only the backbiting feuds were eliminated it
would be excellent!
The installation guide just says don't apply A/C until the wiring
is finished, and is generally unhelpful.
I have the main cabinet with A/C and battery, plus the high-current
cabinet with A/C and battery. What gets power the very first time
when turning it on (to probe for modules, assign keypads, etc)?
Also, does it use flash memory for its programming? I assume it
doesn't need power (external or on-board battery) to keep its
programmed config, right?
As for batteries, when do you connect the big backup batteries and
charge them up?
--ian
P.S. Thanks to everyone for the help so far, this group has been
very useful. If only the backbiting feuds were eliminated it
would be excellent!