P
Pits
APPRECIATE ANY IFO OR OPINION
APPRECIATE ANY IFO OR OPINION
Pits said:APPRECIATE ANY IFO OR OPINION
Thank you James initially 3 megs scaling up to 10 megJames said:My question for you Pits, are you asking about a system able to produce
15-16,000 kWh a year (a family that are electricity hogs using about 2
times the normal amount, or about a PV system for a small town / community.
What do you mean by LARGE SCALE?
See my web site below:
Thanks to all that repliedSteveC said:System Size
(kWac) State Country Operational Date Facility Module Manufacturer(s)
230 CA USA 09/25/01 Neutrogena Corporate Offices Powerlight
288 CA USA 07/01/02 San Jose Campus Siemans/Sanyo
289 NY USA 01/01/96 Gun Hill Bus Depot Solarex
300 DE USA 01/01/02 AstroPower Manufacturing and Office Complex
AstroPower, Inc.
500 NJ USA 04/15/03 Janssen Pharmaceutica PowerLight
1600 OH USA 04/18/02 Energy Designs, Inc. BP
3139 AZ USA 07/01/01 Springerville Generating Station Solar System
ASE, FirstSolar & BP Solarex
Done and is as flat as a pan cakeChuck said:First select where the first 100 acres of PV and wind mills will go...
Then provide an actually useful question.
....Pits said:Thank you James initially 3 megs scaling up to 10 meg
town of 500 with growing light industrial
so draw off grid and sell back into grid type thing
240 volts here in oz btw .
Anthony said:...
At these sizes you might find it more cost effective to use
solar thermal collectors and steam turbines.
http://www.solel.com/products/pgeneration/ls2/kramerjunction/
These are aprox 30 Megawatt fields but I'm sure they have some
slightly smaller versions.
Anthony