In the main breaker panel I have a 50A, dual phase breaker. This feeds a typical electric clothes dryer outlet. Two hots, one neutral, one ground. I would like to go from that outlet to a 110V 4-way box. The 4-way consists of two duplex 110V three prong outlets. I would like to take phase A to one duplex and phase B to the other duplex using a common neutral and common ground. Will I run into a problem with this design?
-
Categories
-
Platforms
-
Content