Well I've got nowt to lose Martin so I don't mind having a go at 'owt. Re the battery packs, did "that" trick

and it appeared to work as each cell suddenly showed just about 3V and connected, just over 9.5V. Put the controller back in cct however and same problem as before. Interestingly enough, when I measure the full pack with my dmm, it instantly shows about 10V but quickly drops to about 5.5-6V and holds there. Using my old Analogue BT tester, it shows nothing, even on the 5V scale so I'm guessing that will be down to internal resistances between the meters ?
Atm I'm using my Parkside Dremel-type tool charger on the remaining good battery so at least I've got summat to use, if a bit slow. The duff battery packs just refuse point-blank to charge but I might try to rig up summat on a bit of veroboard (sp?) to see if I can use the good controller out-board so to speak and allow the other batteries to charge.
I'm actually enjoying faffing about with this, shows what a sad life I lead

